From Tony Osauzo, Benin
Edo State Governor Monday Okpebholo has expressed displeasure over the slow pace of work on the Benin-Sapele road project despite the financial mobilisation of contractors.
Consequently, the Governor has summoned the contractors handling the section of the road project funded by the Edo State Government to explain the reasons for the delay or face serious sanctions.
The governor drove through the over 20 km stretch of road, stopped at several points, and inspected the quality of the drainage, pavement, and materials used for the construction.
googletag.cmd.push(function() { googletag.display(‘div-gpt-ad-1718806029429-0’); });
The inspection, which occurred on Sunday evening, took the governor and his entourage through the gridlock on the road, where he acknowledged good cheers from motorists who expressed appreciation for the collaboration between the Edo State Government and the Federal Government in ensuring that the ever-busy road is getting the needed attention.
Governor Okpebholo also stopped at Peanut Junction, Ogheghe Junction by Akenuwa Community, Ogheghe Road off Sapele Road, and Old Road, which was abandoned by previous administrations after several promises to the residents in the area.
Speaking to journalists shortly after the inspection, the governor said his administration is concerned about the well-being of Edo people; hence, he embarked on the inspection to ensure the road is completed in time to end the plight of the people and revive the economic activities in the area.
“I have inspected what they are doing, and the work is solid and good. But the problem is the level of speed, which is not good for me. People are suffering due to the slow pace of work, and we have to do something drastic to ensure that the road is motorable by reducing the plight of the people who are using the road,” he said.
The governor queried the design of the drainage and assured the Edo people that his administration will look at the design of the drainage system to make necessary adjustments to ensure that the construction will address the flooding menace.
“The second segment of the road, which is another 7 km, will soon commence, but apart from the road, the drain is important to us because it is responsible for taking water out.
“Drainage is important, and the design stopped the construction of the drainage system in the middle of the town. The question is, where will the water go to? We will look at the design again to ensure that the one we will finally construct for this road takes water out of town and desilts it at the proper place. When this is done, it will enable us to have a good and lasting road after completion.
“Our people are suffering and crying, and we are out here this evening to check the level of work done and ensure speedy completion,” Okpebholo added.
The post Okpebholo summons contractors over Benin-Sapele road delay appeared first on The Sun Nigeria.
